Sign In
We'll never share your email with anyone else.
Reset Password

Enter your email address and we'll send you a link to reset your password.

Back to Sign In

This Old House Season 26 Episode 20 Prefab Meets Custom - The Carlisle House 2004

Norm learns how the seamless, clog-less gutter system for the barn is fabricated and installed. Flooring contractor Patrick Hunt shows Kevin how to install a pre-finished engineered cherry floor throughout the first floor of the house. Tom builds the railing system for the barn stairway, while Richard visits a new product design and testing facility for the plumbing industry. Wine cellar contractor Michael Galvin shows Kevin a 3-D fly-through animation of the future wine cellar. At the end of the day, cabinets for the kitchen, pantry, wet bar, and laundry room arrive on a truck from Pennsylvania.

  • Released: 2005-02-19
  • Runtime: 30 minutes
  • Genre: Documentary
  • Stars:
  • Director:
  • Source: CWR-CRB
Download : MKV
Download : MP4

Similars

Recommendations